The expert team of the company “Aurora Green” ltd. has prepared the necessary documentation for the issuance of an Integrated Pollution Prevention and Control (IPPC) permit, which has been submitted to the Ministry of Environmental Protection, for the operation of the insulation materials production plant “Knauf Insulation” ltd. in Surdulica.