– Testing, analysis and drafting of the Environmental Report –
Analysis of measurements results of “ground zero” situations with reports on testing parameters of soil pollution at locations of factory „Prva Iskra – Bazna hemija“ – in restructuring, Barič and factory for production of linear alkyl benzene „Prva Iskra – LAB“ ltd. Barič – in restructuring, Barič
Analysis of measurements results of “ground zero” situations with reports on testing parameters of soil and underground water pollution at location of future Factory of Automobile Parts MTE Barič
Analysis of measurements results of „ground zero” situations with reports on testing parameters of soil and groundwater pollution at complex of former factory of rubber products “Rekord” Rakovica, Belgrade
Analysis of measurements results of „ground zero” situations with reports on testing parameters of pollution at location of Central distributive warehouse of food merchandise and food commodities and consumer goods with associated content
Analysis of measurements results of “ground zero” situations with reports on testing parameters of underground water pollution and monitoring plan
Report on state of soil pollution at location of Lola Fluidomatik ltd. Belgrade- Zemun – in bankruptcy
Environmental Due Diligence for “SINTELON.RS” ltd. Bačka Palanka
Environmental Due Diligence for “SINTELON.RS” ltd. Bačka Palanka
Analysis of present state of environmental pollution at the location of previous “IMT-FOM” plc
Environmental Due Diligence for Apatin Brewery – Apatin, Serbia
Report on testing of soil – municipality Palilula, Belgrade
Report on testing of soil
Report on the state of the environment JP ”Toplana” Kikinda
Analysis of measurements results of “ground zero” situations with reports on testing parameters of soil pollution at locations in Inđija
Analysis of measurements results of “ground zero” situations with reports on testing parameters of soil pollution at locations in Nova Pazova
Soil condition report